Fiber crew paperwork

The paperwork a fiber crew actually needs on the truck.

Scope, cable, splice, OTDR — the four things an inspector asks a fiber crew about on Monday morning. Most as-builts come back half-filled, the route labels never line up with the FDH schedule, and the OTDR trace gets lost in the truck. The Gridpin fiber paperwork is one sign-off form per install, front-to-back, in the order the lead tech writes it — with US Letter and A4 layouts and a single commercial-use license.

FIB-01 is the anchor: per-install scope, cable, splice, and OTDR pass-fail sign-off — LV-12 rides alongside it for the fiber pull and splice record, LV-03 for the installer-facing install checklist a fiber crew also carries on a copper or hybrid day, and LVB-01 bundles twelve low-voltage and fiber forms (FIB-01, LV-12, the OTDR lambda log, the patch-panel termination map, the splice cassette log) under one license. Drafted on a real clipboard by a real foreman. Not a generic daily log, not an invoice template with a fiber sticker on it.

Anchor SKU
FIB-01
Related kits
LV-12 · LV-03 · LVB-01
Paper
US Letter · A4

What a fiber kit carries

Four sections a fiber crew actually fills out on a real job.

The kit follows the order a fiber lead tech writes it on a clipboard — scope and project on day one, cable and route on pull day, splice locations when the closure goes together, and the OTDR test + acceptance block when the GC signs the lid back on. No duplicate fields, no “create your own” rows, no AI-generated trade-buzzword filler.

Scope + project

A fiber pre-job block the lead fills out on day one before the reel leaves the yard.

Project, owner, GC, scope (backbone, horizontal, FTTH drop), site contact, NTP date, scheduled completion — the strip a fiber lead reads before the crew rolls. Same row order a working tech writes it on the clipboard, not a manufacturer datasheet.

Cable + route

Cable ID, reel, run, distance, slack — the row the FDH schedule gets cross-checked against.

Launch reel, receive reel, conduit ID, handhole ID, pole ID, footage, slack on both ends. SMF or MMF, fiber count, jacket rating. The fields an inspector asks about when they open the lid, not the language a template aggregator writes for an office install.

Splice locations

FDH tray, splice closure, connector by method — laid out the way the lead closes the handhole.

FDH tray assignments, splitter tray assignments, splice closures, SC/APC vs. SC/UPC by connector type, fusion or mechanical or pre-polished by method. The as-built the next tech needs to read when they open the closure six months later, not the way a vendor catalog numbers it.

Test + acceptance

OTDR λ, dB loss vs. budget, witness initials — the block the GC signs before the lid goes back on.

OTDR λ at 1310 / 1550 nm (both), dB loss per segment vs. budget, continuity / end-face inspection, pass/fail with witness initials from the GC or owner, acceptance sign-off at the bottom. Same row order a lead tech writes on the wall plate — not the language a vendor datasheet reads.

Anchor + adjacent kits

The four kits a fiber crew reaches for on a real install.

Lead with FIB-01. Add LV-12 for the fiber pull and splice record, LV-03 for the copper-or-hybrid install day, or step up to the twelve-form low-voltage & telecom pack under LVB-01.

Questions about fiber-crew paperwork, file formats, or the commercial-use license? Read the buyer FAQ.

Read the buyer FAQ
Anchor · FIB-01

Fiber Optic Install Form

Per-install fiber-optic sign-off — scope, cable, splice, OTDR pass/fail, and acceptance — laid out in the order a lead tech writes it before they close the handhole.

FIB-01 · Rev. 1

US Letter + A4
$19
Adjacent · LV-12

Fiber-Optic Pull & Splice Record

Single-form field record for SMF/MMF pulls — cable ID, route, distance, splice plan, OTDR pass/fail — laid out in the order a tech actually fills it in.

LV-12 · Rev. 2

US Letter + A4
$11
Installer-facing · LV-03

Low-Voltage Install Checklist

Per-job cable, termination, and test-result record for low-voltage and telecom crews — one form per install, front-to-back, the way the lead tech fills it out before they pack the van.

LV-03 · Rev. 1

US Letter + A4
$19
The fiber pack · LVB-01

Low-Voltage & Telecom Pack

Twelve low-voltage and fiber crew forms in one pack — install sign-off, fiber-optic pull and splice record, OTDR test log, patch-panel termination map, splice cassette log, and the fiber acceptance sign-off — laid out the way a lead tech actually fills them out between the truck and the FDH.

LVB-01 · Rev. 1

US Letter + A4
$49

More from this trade

Keep the Fiber-Optic paperwork in one working set.

Related Gridpin forms for the same kind of job, priced clearly and ready to print.

Common Questions Before You Buy

See the licensing and commercial-use answer

Browse the full catalog

Fiber is one of seven trades Gridpin ships for.

Browse the full catalog — low-voltage install, daily log, RFI tracker, pre-trip equipment checks, homeowner quote sheet, and the 25-form construction superintendent bundle.

Browse the catalog

US Letter + A4 · 1 commercial-use license per kit.

Gridpin fiber-optic crew paperwork and fiber-optic install forms: per-install scope, cable, splice, and OTDR test-and-acceptance sign-offs (FIB-01), fiber-optic pull and splice records (LV-12), installer-facing install checklists a fiber crew also carries (LV-03), and the twelve-form low-voltage & telecom pack that bundles fiber + LV under one license (LVB-01). OTDR λ at 1310 / 1550 nm, dB loss vs. budget, witness initials from the GC or owner. US Letter and A4 layouts, one company-wide commercial-use license, drafted in the field by a 20-year construction pro. Printable the same afternoon.